by Support Getsim | October 10, 2017 | Uncategorized
Part 6: Miscellaneous Additional Changes to A201. As final article of the series, Part 6 covers certain miscellaneous, but nonetheless, important changes in the A201 document which did not fit in the categories covered in Parts 1-5. Contractor’s Construction Schedule....
by Support Getsim | October 9, 2017 | Uncategorized
Part 5: Revisions to the B101 Owner/Architect Agreement. The changes in B101 dovetail with other newly-modified documents, such as the A201 General Conditions, and this article should be read in conjunction with Parts 1-4 of the series. Architect Compensation....
by Support Getsim | October 8, 2017 | Uncategorized
Part 4: A201 and Related Documents: Insurance and Bonding Provisions. The Lay of the Land. The most significant changes brought about by the 2017 modifications are those related to the insurance and bonding. The modifications are sweeping, both in form and in...
by Support Getsim | August 25, 2017 | Uncategorized
Part 3: Owner/Contractor Relationship Revisions to A201 General Conditions Document This article is the third in a series that explores the 2017 modifications to the AIA’s most commonly used construction contracting documents, including the A101, B101 and A201...
by Support Getsim | August 15, 2017 | Uncategorized
Part 2: Notice Requirements Under the Revised A201 General Conditions Document. This article is the second in a series which addresses the 2017 modifications to the AIA’s most commonly-used construction contract documents. Discussed herein are changes to the various...